Case Study — ZIP-STRUT

Fast, flexible containment for a tight corridor installation

Penguin MEP needed a multi-service suspension solution that could handle restricted corridor access and a timber-frame build — and have it up and running in a single day.

Contractor Penguin MEP
Wholesaler CEF, Wigston
Area Sales Manager Steve Blackhurst
Sector Education
1 Day Full Install
48hrs Design Turnaround
2 Containment Routes
Ready Pre-Assembled Delivery

Restricted corridor. Two containment routes. One deadline.

Penguin MEP required a suspension solution that would significantly reduce installation time while overcoming the challenges presented by a restricted corridor space and a timber-framed construction environment.

The project required substantial containment for both mechanical and electrical services within narrow corridor spaces. Due to limited access, running cable trays, pipework and associated services on a single containment route would have created significant installation difficulties.

To address this, the containment had to be split across two separate bracket systems running along the corridor — increasing the need for a suspension solution that was quick to install, easy to access, and suitable for the building's timber frame construction.

"Out of the box and up in the air in minutes!"

Site Installer, Penguin MEP

ZIP-STRUT — pre-assembled, delivered ready to install

After reviewing the challenges Penguin MEP were facing, we recommended ZIP-STRUT. Designed to save time on site, ZIP-STRUT is pre-assembled off-site and delivered ready to install, helping to significantly reduce installation time.

The system also offers excellent accessibility, with simple post-installation adjustment and reusable basket tabs that make future modifications quick and straightforward.

By combining the system with our Tray Clips, installers could easily position, adjust and securely fix cable tray within the multi-service strut arrangement — making the whole installation process faster and more efficient.

Using a Zip-Clip solution also gave Penguin MEP access to a wide range of fixing options, making it easy to work with the building's timber-frame construction. Before installation began, Penguin worked closely with our in-house technical team to develop the ideal combination of strut lengths, fixings and components — with UNI-Lock identified as the perfect option for the material.

"We can't believe how quick and secure these tray clips are… game changing!"

Site Installer, Penguin MEP

James Horton & Katie George on site mid-install

James Horton (R&D Commercial Director) and Katie George (Marketing Executive) visited the site mid-install to catch up with the installers and see ZIP-STRUT in action.

The feedback on the day was immediate — installers were particularly enthusiastic about the Tray Clip accessory, highlighting the speed and security it delivered compared to traditional methods.

Pre-assembled off-site Timber-frame compatible Reusable basket tabs Tray Clip accessory UNI-Lock fixing Post-install adjustable

The smarter way to suspend multi-service containment

ZIP-STRUT is Zip-Clip's pre-assembled strut suspension system, built to cut installation time without cutting corners. Every unit is assembled off-site to your specification — strut lengths, fixings, and accessories included — so it arrives on site ready to go straight up.

With a wide range of compatible fixing options, ZIP-STRUT works across concrete, timber, and steel structures, making it one of the most versatile suspension systems available for M&E contractors.

Pre-assembled to spec Wide fixing range Multi-service capable Post-install adjustable Tray Clip compatible
  • Project design completed within 48 hours
  • Installation-ready solution delivered directly to site
  • Product installed and operational within a single day
  • Improved access for M&E service installation and future maintenance
  • Reduced installation time compared to traditional bracketry methods
  • Ideal solution for a timber-framed construction environment

See how much time ZIP-STRUT could save on your next project

Based on Zip-Clip's internal installation time data. Compare ZIP-STRUT against traditional threaded rod and strut assembly.

50

Estimated time comparison

Threaded rod method (hours) —
ZIP-STRUT (hours) —
Hours saved —
Saving —

Loading...

Based on Zip-Clip internal installation time data. Results are indicative and will vary by site conditions, installer experience and configuration. ZIP-STRUT installation time includes pre-assembly off-site; threaded rod time reflects full site assembly.

Efficient installation. Minimal disruption. Project on schedule.

The combination of fast design support, prefabricated components and practical training enabled Penguin to complete the installation efficiently and with minimal disruption to the wider construction programme.

By handling the design and specification work upfront — in collaboration with our in-house technical team — Penguin MEP arrived on site with everything they needed. No site fabrication, no delays, no wasted time.

Complex challenge. Simple solution.

By combining rapid design turnaround, technical expertise, and an installation-ready suspension system, Zip-Clip helped Penguin MEP simplify a complex containment challenge and keep the project moving on schedule.

The result was a cleaner, faster installation that gave the team improved access for M&E services — and a system that's easy to maintain and modify in the future.

  • Fast design support — project spec signed off in under 48 hours
  • Delivered pre-assembled, ready to install on arrival
  • Full single-day install in a restricted-access corridor
  • Compatible with timber-frame fixings via UNI-Lock
  • Tray Clip accessory dramatically reduced cable tray fixing time